2.png 1.png IMG_9631.JPG IMG_9629.JPG

GOLCUK NAVY - FLOATING DOCK

Date 2018
Location YALOVA
Tonnage 450 TON
Client GOLCUK NAVY
Client SHIP CONSTRUCTION

Our Solutions

  • FLOATING DOCK REPAIR AND MAINTENANCE
  • Operation of slipway
  • Blasting
  • Replacement of required sheet, profile, pipes
  • Blasting and painting
  • Delivery to the shipyard.
  • The project timetable could be completed within plans and without penalty.